Nigeria
  • Nigeria
  • UK
  • UAE
  • Canada
  • 9, Bolaji Akinyemi Crescent, Katampe Extension District, Abuja, Nigeria.
  • Mon - Sat 8.00am - 6.00pm
  • +234-809-750-0500
  • Regus House, Victory Way, Admirals Park, Crossways Business Park, Dartford, Kent DA2, 6QD, United Kingdom
  • Mon - Fri 8.00am - 6.00pm. 
  • 234-817-750-0500
  • 25, Al Maqeed Street, Al Reem Island, Abu Dhabi, United Arab Emirates.
  • Mon - Fri 8.00am - 6.00pm. 
  • 234-817-750-0500
  • 2042 Constance DriveOakville, Ontario L6J2V5Canada
  • Mon - Fri 8.00am - 6.00pm. 
  • #800000
Interaf Group Ltd
  • Home
  • About Us
  • Services
  • Our Team
  • Contact Us
  • Completed Projects
Interaf Group Ltd
  • Home
  • About Us
  • Services
  • Our Team
  • Contact Us
  • Completed Projects
+234-809-750-0500Call
Write us info@interafgroup.com
No. 9, Bolaji Akinyemi Crescent, Diplomatic Zone, Katampe Extension District, Cadastral Zone B19, Post Code 901101, Abuja, FCT, Nigeria.
HomeCompleted Projects

Completed Projects

Procurement of materials and Construction of the 330KV Double Circuit Kaduna Power Plant

Procurement of materials and Construction of the 330KV Double Circuit Kaduna Power Plant – Mando Road Substation (25KM).

Project/Construction Management Services for 330KV D/C OHTL Abuja – Shiroro, and 2 X 150MVA 330/132/3KV Substation at Katampe

In partnership with Colenco Engineering of Switzerland: Project/Construction Management Services for 330KV D/C OHTL Abuja – Shiroro, and 2 X 150MVA 330/132/3KV Substation at Katampe.

Project Management, Construction Supervision of Akure – Ado Ekiti 132KV Trx Line and 2 X 40MVA, 132/33 KV substation at Ado Ekiti

In partnership with Group RSW, Canada:  Project Management, Construction Supervision of Akure – Ado Ekiti 132KV Trx Line and 2 X 40MVA, 132/33 KV substation at Ado Ekiti.

Advisory/Consultancy services in respect of development of city gas distribution network for Imo state

Advisory/Consultancy services in respect of development of city gas distribution network for Imo state gas distribution area (04gdz): Nigerian Gas Marketing Company Limited (NGMC) in partnership with Green Rock Limited.

2021 Advisory/Consultancy Services

2021 Advisory/Consultancy Services in respect of proposed partnership proposal on gas and power off-take opportunities being negotiated between NNPC Gas and Power Investment Company Limited (NGPIC), Kano Electricity Distribution Company Plc and (KEDCO)/Kaduna Electricity Distribution Company Plc (KAEDCO)

Design, Engineering, Procurement and installation of Chemical Dye Injection System

Design, Engineering, Procurement and installation of Chemical Dye Injection System @ Pipeline and Product Marketing Company (PPMC) Depots.

Upgrade of existing metering station and provision of new train complete with appurtenances for 34.1km of gas pipelines

Upgrade of existing metering station and provision of new train complete with appurtenances for 34.1km of gas pipelines between diameters 400mm to 600mm

Sapele – Oben Pipeline Integrity Assessment and Sapele Metering Station

National Integrated Power Projects (NIPP)

Rehabilitation of quay walls and platform at Tin Can Port, Lagos

Federal Ministry of Transport: Rehabilitation of quay walls and platform at Tin Can Port, Lagos.

Replacement of old coffer dam structure with straight web sheet piles. Provision of 130m quay wall using sheet piles connected by tie rods. Protection works from mooring vessels were provided. Works

Construction of Total Support Refinery, Free Trade Zone, Calabar

Total Support Refineries: Construction of Total Support Refinery, Free Trade Zone, Calabar Site preparation, civil works, electrical and mechanical erection

Engineering, Procurement & Construction of 141km of 330 KV OHTL.

Power Holding Company of Nigeria:
Alaoji-Calabar 330 KV OHTL: In association with Energovod s.r.o, Czech Republic. Provision of 141km of 330 KV OHTL. Responsibilities included route survey, foundation design and construction, tower erection and stringing. Testing and commissioning.

Lapai Water Supply Scheme

Power Holding Company of Nigeria:
330KV D/C OHTL Abuja – Shiroro In association with Colenco, Switzerland, INTERAF provided project and Construction Management services.

Rehabilitation of Omu-Aran to Ajase highway

Federal Ministry of Works:
Rehabilitation of Omu-Aran to Ajase highway Rehabilitation of 164km single carriage with 2 bridges and 14 culverts. Erosion protection works.

Akure-Ado Ekiti 132KV transmission line

Power Holding Company of Nigeria:
Akure-Ado Ekiti 132KV transmission line In conjunction with RSW Inc, Canada, provided project management and construction supervision of the project which was executed by Siemens AG.

Chemical Dye Injection system

Nigerian National Petroleum Corporation (NNPC):
Chemical Dye Injection system EPC for the provision of a chemical dye injection system for the Petroleum Product Marketing Company, a subsidiary of NNPC

Construction supervision for the rehabilitation and reinforcements of the eight substations

Power Holding Company of Nigeria: Enugu, Oji River, Awka, Onitsha, Port Harcourt, Calabar, Aba and Eket 132/33 KV substations Project Management and Construction supervision for the rehabilitation and reinforcements of the eight substations

Construction Management services: 2 X 150 MVA 330/132/3KV Substation at Katampe

Power Holding Company of Nigeria:
2 X 150 MVA 330/132/3KV Substation at Katampe In association with Colenco, Switzerland, INTERAF provided project and Construction Management services.

Rehabilitation of the four Irrigation Schemes in Nigeria

Federal Ministry of Water Resources:
Rehabilitation of the four Irrigation Schemes in Nigeria Review and redesign of irrigation and drainage systems, canals rehabilitation and re-alignment, augmentation of irrigation water supplies for Bakolori, Kano, South Chad and Lower Anambra Irrigation Schemes.

Construction of water supply system including provision of 80km of pipes from 100mm to 250mm.

Gombe State Water Corporation:
Bajoga, Nafada, Dukku and Hashidu Townships Water Supply Schemes Condition survey of all components of existing scheme, production of base maps from satellite images, designs for rehabilitation of water supply components, hydraulic modeling of proposed expansion, environmental impact assessment studies, and construction of water supply system including provision of 80km of pipes from 100mm to 250mm.

132KV D/C OHTL Owerri-Ahoada-Yenagoa

Power Holding Company of Nigeria:
132KV D/C OHTL Owerri-Ahoada-Yenagoa In association with Colenco, Switzerland, INTERAF provided project and Construction Management services.

Supervision of water supply rehabilitation works

World Bank National Water Rehabilitation Programme Zone A – Adamawa, Taraba, Plateau, Nassarawa, Niger and FCT Supervision of water supply rehabilitation works

1 X 60MVA 132/33KV substations

Power Holding Company of Nigeria:
1 X 60MVA 132/33KV substations In association with Colenco, Switzerland, INTERAF provided project and Construction Management services.

Koko Multipurpose Dam and Irrigation Project

Kwara State Government:
Koko Multipurpose Dam and Irrigation Project Design and construction of earth dam with active storage of 15,000 cu.m with spill way and intake works. Design and provision of 50 ha sprinkler irrigation scheme

2 X 40 MVA, 132/33 KV substation at Ado-Ekiti

Power Holding Company of Nigeria:
2 X 40 MVA, 132/33 KV substation at Ado-Ekiti In conjunction with RSW Inc, Canada, provided project management and construction supervision of the project which was executed by JKN.

Computerization of the Nigerian Stock Exchange

Nigerian Stock Exchange: Computerization of the Nigerian Stock Exchange Requirements gathering and documentation, hardware selection and installation, training and user support